Every build begins with an on-site base-condition and drainage assessment. It checks soil stability, existing slope and water runoff paths before a single number is written down. Southern California's coastal-zone soils can shift seasonally, so sub-base compaction depth is set to match your specific site.
Once the base is confirmed, the builder lays a crushed-aggregate sub-base, pours the concrete or asphalt slab, and allows the full cure interval before applying the acrylic colour coat. Skipping that interval causes surface delamination within a season, the written estimate states the cure schedule explicitly.
Line marking follows the acrylic topcoat using regulation dimensions for the key, three-point arc, and free-throw line. Backboard anchor placement is checked against the finished surface level. A final walkthrough confirms every element against the agreed spec before the job is signed off.