Every resurfacing job starts with a base-condition assessment. It checks the existing slab for cracks, drainage slope and acrylic adhesion. Cracks that follow a pattern across the surface often indicate sub-base movement, which needs to be addressed before a new coat is applied or the same damage reappears.
Confirmed cracks are routed, cleaned, and filled with flexible polyurethane filler. The surface is pressure-washed and allowed to dry before the first acrylic colour coat layer is applied. Each layer requires its own cure interval, the written estimate states the number of layers and the cure schedule between them.
Line marking is applied after the final acrylic layer has cured, using regulation dimensions for the agreed sport or sports. A final walkthrough checks surface texture, drainage slope, and line placement against the spec. Nothing is signed off until every item on the written estimate is confirmed complete.