Skipped Sub-Base Prep
A sub-base compacted in a single pass settles unevenly, cracking the slab within the first wet season.
Layered Compaction
The sub-base is compacted in staged layers to a specified depth, verified before the slab is poured.
Courts Built Right
A regulation court with the right sub-base, acrylic spec, and drainage for your exact site.
What Goes Wrong
A sub-base compacted in a single pass settles unevenly, cracking the slab within the first wet season.
The sub-base is compacted in staged layers to a specified depth, verified before the slab is poured.
Coastal fog and inland UV affect cure times differently; using one spec for all sites causes early coat delamination.
Acrylic coat layers and cure intervals are chosen based on your site’s coastal or inland exposure profile.
A slab poured without a verified drainage slope pools water at the baseline, accelerating surface wear.
Drainage slope is measured during the site assessment and built into the slab spec before the pour begins.
Net post sleeves set after the slab cures are never as stable as sleeves cast into the pour at the correct depth.
Net post anchor sleeves are positioned and set during the slab pour, not retrofitted after the concrete cures.
Why Choose Us
Every enquiry follows the same accountable process, assessment, written estimate, and a final sign-off walkthrough.
Materials, surface spec, and cure intervals are listed in writing before a single shovel moves.
A local court builder documents soil stability and drainage slope before the estimate is written.
The final walkthrough confirms every line, anchor, and slope matches the estimate before the job closes.
We arrange local court builders across California, including San Diego’s coastal and inland areas.
The itemised estimate covers sub-base, slab, acrylic layers, anchors, and line marking, nothing is left vague.
The Process
01
Tell us your site location and court goals, and we arrange a local builder to schedule an on-site assessment.
02
The builder documents base condition and drainage, then delivers an itemised estimate covering every stage and material.
03
Construction runs to the agreed spec, and the job closes only after a walkthrough confirms every item is complete.
Pricing Estimates
| Job | Typical cost | Unit |
|---|---|---|
| Residential court build | $25,000-$150,000 | Project |
| Community or club court | $60,000-$120,000 | Project |
| Standard new court with full build-out | $60,000-$120,000 | Project |
Tell us your site and what you need, a local court builder will assess base condition and drainage and put every cost in writing before anything is booked.