A base-condition assessment comes first. The local court builder maps every crack, checks whether they follow a pattern that suggests sub-base movement, and tests drainage slope across the full 20 x 44 ft surface. Cracks caused by base shift need a different repair approach than surface-only fractures.
Confirmed cracks are routed to a clean edge, blown clear of debris, and filled with a flexible polyurethane compound. The surface is then cleaned, etched if needed for adhesion, and coated with two acrylic colour coat layers. Each layer cures fully before the next is applied, the written estimate states the cure schedule.
Regulation line marking is applied last, covering the non-volley zone, centerline, and all boundary lines in the agreed colours. A final walkthrough checks surface texture, drainage slope, and line placement against the original spec. The job is not signed off until every item is confirmed.