Drainage provision is the first design decision on any putting green. The site assessment maps your yard's natural drainage paths and sets the excavation depth and sub-base compaction spec accordingly. Southern California's clay-heavy soils in some neighborhoods require a deeper aggregate layer to prevent water retention under the turf.
The compacted sub-base is shaped to include any contours or breaks you want in the green. Synthetic turf is then laid over a weed-barrier membrane, cut to shape, and secured at the edges. Infill material, typically silica sand or a sand-rubber blend, is brushed in to set pile height and firmness.
Cup sleeves are anchored into the sub-base before the turf is laid, positioned to allow realistic putting lines. A final walkthrough checks surface roll, drainage slope, cup depth, and edge finish. The written estimate states turf pile height, infill spec, and the number of cup positions included.