Uneven Sub-Base
A sub-base graded by eye rather than instrument leaves low spots that pool water and create dead bounces.
Graded to Spec
A base-condition assessment sets the compaction spec to hit the drainage slope without dead spots.
Pickleball Courts
A regulation 20 x 44 ft court with a flat, consistent surface your game can actually rely on.
What Goes Wrong
The failure modes are predictable, and every one of them shows up after the contractor has left.
A sub-base graded by eye rather than instrument leaves low spots that pool water and create dead bounces.
A base-condition assessment sets the compaction spec to hit the drainage slope without dead spots.
Applying acrylic colour coat before the slab has fully cured causes delamination within one or two seasons.
The written estimate lists slab thickness, coat layers, and the cure interval before coating begins.
Lines painted without a regulation layout check leave the non-volley zone or sidelines outside the 20 x 44 ft boundary.
Every line is measured to the regulation boundary and verified at the final walkthrough before sign-off.
Net post sleeves set after the pour rather than during it shift under load and require costly re-work.
Post anchor sleeves are positioned to regulation dimensions during the slab pour, not retrofitted afterward.
Scope of Work
From raw ground to a regulation court ready for play, here is what the work includes.
Full build from sub-base compaction through concrete or asphalt slab, acrylic coat, and regulation line marking.
Sleeves set during the slab pour to regulation dimensions, checked for depth at the final walkthrough.
Multi-layer acrylic coat applied after full cure, chosen to suit coastal fog or inland heat at your site.
Baseline, sidelines, centerline, and non-volley zone marked in contrasting colours within the 20 x 44 ft boundary.
Single-court builds sized for residential lots.
Two or more courts on a shared slab.
Pickleball lines overlaid on a tennis court.
Why Choose Us
Every step from first call to final sign-off is structured so nothing is left to a verbal agreement.
No work is scheduled until you hold an itemised estimate listing materials, scope, and cure times.
Every enquiry starts with an on-site evaluation and a written base-condition report, not a phone quote.
We arrange local court builders familiar with coastal soil conditions and county permit requirements.
Lines, anchor depth, and surface finish are checked at a formal walkthrough, you confirm the spec is met.
We arrange court builders across California, so there is a named local contact accountable for your build.
The Process
01
Submit your site details and a local court builder schedules an on-site base-condition and drainage evaluation.
02
You receive an itemised estimate covering sub-base spec, slab thickness, acrylic layers, and all line marking.
03
Construction runs to the agreed spec, ending with a walkthrough that confirms anchors, lines, and surface finish.
Pricing Estimates
| Job | Typical cost | Unit |
|---|---|---|
| Tennis court conversion | $20,000-$50,000 | Project |
| Backyard residential court | $15,000-$30,000 | Project |
| Community or HOA court | $25,000-$60,000 | Project |
| Commercial or club court | $40,000-$100,000 | Project |
Tell us your site and what you need, a local court builder will assess base condition and drainage and put every cost in writing before anything is booked.