A base-condition assessment maps every crack and checks drainage slope across the full 78 x 36 ft surface. A local court builder identifies whether cracks are surface-only or follow sub-base joint lines, because each requires a different repair approach. Applying acrylic over an unrepaired structural crack means the crack reappears within one season.
Cracks are routed to a clean edge, filled with flexible polyurethane compound, and allowed to cure before the surface is cleaned and prepared for coating. Two acrylic colour coat layers are applied, each with its own cure interval. San Diego’s coastal sites may require a longer cure window due to overnight moisture, the written estimate accounts for that.
Regulation line marking is applied after the final coat has cured, covering all baseline, service, and sideline positions. A final walkthrough checks surface texture, drainage slope, and line placement against the agreed spec. The job is signed off only when every item on the written estimate is confirmed complete.