The process starts with an on-site base-condition and drainage assessment. It checks soil stability, natural slope and water runoff before excavation depth and sub-base compaction requirements are specified. Getting this stage right determines how long the finished surface holds up under regular use.
Sub-base material is compacted in layers, each checked for density before the next is added. The slab, concrete or asphalt depending on the sport and budget, is poured and allowed to reach its full cure interval before any acrylic colour coat is applied. The written estimate states the cure schedule and the number of acrylic layers.
Line marking is the final stage, applied after the topcoat has cured. Regulation dimensions are used for the agreed sport or sports. A final walkthrough checks line placement, surface texture, drainage slope, and anchor positions for any net posts or backboards before the job is signed off.